Permitting
Agencies (for
non-UC developments)
|
| Agency |
Description |
UC
MBEST Center
(www.ucmbest.org) |
Enters
into ground lease with developer partner, reviews
proposed projects and tenants for consistency
with MBEST Center Master plan, upon approval,
developer obtains permits from the City of Marina.
|
City
of Marina
(www.ci.marina.ca.us) |
Issues
grading, conditional land use, building, and occupancy
permits and conducts architectural review and
California Environmental Quality Act review
within the City of Marina.
|
| Monterey
Bay Unified Air Pollution Control District (www.mbuapcd.org) |
Issues
authority to construct and permit to operate HVAC
equipment.
|
Marina
Coast Water District
(www.mcwd.org) |
Approves
and provide potable water, recycled water, and
wastewater connections.
|
Monterey
County Health Department
(www.co.monterey.ca.us/health) |
Issues
permits for food preparation, storage tanks, and
hazardous materials.
|
California
Department of Fish and Game
(www.dfg.ca.gov/org/region3.html) |
Issues
incidental take permits where development projects
may result in the take of state-listed endangered
species. Permit
has been issued for all UC MBEST Center lands
except parcels CN-14 and CN-16.
|
U.
S. Fish and Wildlife Service
(www.fws.gov) |
Prior
to development on UC MBEST Center lands, USFWS
must issue a concurrence letter regarding habitat
management. A
concurrence letter has been obtained for all MBEST
Center lands except the Central South campus,
which is not planned for near-term development.
|
Federal
Aviation Administration
(www.faa.gov) |
For
projects in the vicinity of airports, the FAA
must issue a determination of no hazard to air
navigation in accordance with Title 14, CFR, Part
77, entitled, "Objects Affecting Navigable
Airspace", or under the authority of the
Federal Aviation Act of 1958 as amended.
|
Monterey
Regional Water Pollution Control Agency
(www.mrwpca.com) |
Issues
capacity determinations
and sewer connection permits.
|
Regional
Water Quality Control Board
(www.swrcb.ca.gov/rwqcb3) |
Issues
National Pollution Discharge Elimination System
Permit (NPDES) for projects that involve disturbance
to 5 acres of land or more, in accordance with
section 402 of the Clean Water Act, 40CFR Section
122. Other
permits issued for projects that may affect water
resources.
|
Fort
Ord Reuse Authority
(www.fora.org) |
Determines
whether general plans are consistent with the
FORA Reuse Plan.
FORA has determined that the Marina General
Plan is consistent with the FORA Reuse Plan and
has incorporated the MBEST Center Master Plan
reference into the FORA Reuse Plan.
|